Will it pass plan check and inspection
That is what the sizing and the clearances are for, and it is why the duct gets its access panels where the code puts them rather than where they are convenient. Nobody can promise you a verdict an inspector makes on the day. What we can do is build to what gets read, and hand over the photographs and specifications that get read with it.
If there is ever a fire, will my paperwork hold up
The install record is dated and itemised: photographs taken through the job, the equipment specifications, and the licence number of the California contractor who signed the work off, CA Lic. #1112881. We cannot speak for your insurer. We can make sure the system you installed is documented rather than assumed.
Will the people who show up know what they are doing
Fifteen years, family owned, and commercial kitchens only. The work is signed off by a licensed California contractor, CA Lic. #1112881, and the crews are the same ones on the Hilton, Taco Bell and UCLA kitchens listed above.
Is the price you quote the price I pay
We size the system on site before quoting it, which is the reason the number holds. What moves a hood quote after the fact is almost always something nobody looked at first: the duct route, the roof, or the makeup air. We look at all three before you get a figure, and if the building turns up something nobody could see, you hear it then.
How soon could you start, and will it hold up my opening
That is a question for the site visit rather than the phone, because the answer depends on what the system has to be and on what the building will allow, and neither is knowable before somebody has looked. What we can do is give you the schedule at the same time as the price, instead of after you have committed to it.